| Specification |
After-sales Service: 12 Months;
Warranty: 12 Months;
Type: Coating Production Line;
Coating: Vacuum Coating;
Substrate: Steel;
Condition: New;
Cooling Mode: Water Cooling;
Heating Temperature: Max 500℃;
Rotate Speed: 1-20rpm Adjustable;
Substrate Size: Diameter 185mm;
Vacuum Chamber: Stainless Steel;
Magnetron Sputtering Target Head: 1 Magnetron Sputtering Heads;
Sample Stage Size: Maximum 4" Substrate Can Be Placed;
Rotated Speed: 1-20 Rpm (Adjustable);
The Highest Heating Temperature: 500℃;
Temperature Control Accuracy: +/- 1.0 °c;
Gas Flow Controller: 2 Mass Flow Meters Installed Inside The Instrument;
Vacuum Pump: a Set of Molecular Pump System, Using One-Button O;
Cooling System: 16L/Min.;
|
After-sales Service: Yes;
Warranty: 12 Months After Installation;
Type: Coating Production Line;
Coating: Galvanized;
Substrate: Steel;
Condition: New;
Heating Method: Electric, Diesel, Ng, LPG;
Operation Mode: Automatic, Semi Automatic, Manual;
Material of Tank: PP Plate, FRP, Granite;
Material of Kettle: Steel or Ceramic;
Installation: Concluded as Customer Required;
Delivery Term: EXW, Fca, Fob, CIF, DDU, DAP, DDP;
OEM, ODM: Available;
Delivery Time: 4-6 Months;
|
After-sales Service: Yes;
Warranty: 12 Months After Installation;
Type: Coating Production Line;
Coating: Galvanized;
Substrate: Steel;
Condition: New;
Heating Method: Electric, Diesel, Ng, LPG;
Operation Mode: Automatic, Semi Automatic, Manual;
Material of Tank: PP Plate, FRP, Granite;
Material of Kettle: Steel or Ceramic;
Installation: Concluded as Customer Required;
Delivery Term: EXW, Fca, Fob, CIF, DDU, DAP, DDP;
OEM, ODM: Available;
Delivery Time: 4-6 Months;
|
After-sales Service: Yes;
Warranty: 12 Months After Installation;
Type: Coating Production Line;
Coating: Galvanized;
Substrate: Steel;
Condition: New;
Heating Method: Electric, Diesel, Ng, LPG;
Operation Mode: Automatic, Semi Automatic, Manual;
Material of Tank: PP Plate, FRP, Granite;
Material of Kettle: Steel or Ceramic;
Installation: Concluded as Customer Required;
Delivery Term: EXW, Fca, Fob, CIF, DDU, DAP, DDP;
OEM, ODM: Available;
Delivery Time: 4-6 Months;
|
After-sales Service: Yes;
Warranty: 12 Months After Installation;
Type: Coating Production Line;
Coating: Galvanized;
Substrate: Steel;
Condition: New;
Heating Method: Electric, Diesel, Ng, LPG;
Operation Mode: Automatic, Semi Automatic, Manual;
Material of Tank: PP Plate, FRP, Granite;
Material of Kettle: Steel or Ceramic;
Installation: Concluded as Customer Required;
Delivery Term: EXW, Fca, Fob, CIF, DDU, DAP, DDP;
OEM, ODM: Available;
Delivery Time: 4-6 Months;
|