99热爱精品在线观看,人妻av中文字幕精品久久久,高清免费不卡一二三区视频,中文文字字幕视频制作,99久久国产精品热88人妻,在线不卡av片免费观看,欧美成人午夜在线观看,日韩制服丝袜中文字幕,亚洲国产精品av在线观看

Integrated Transformer Test System
US$5,000.00-70,000.00 / Set
  • Recommend for you
  • How to Use Triple Frequency Induced Withstand Voltage Test Set Competitive Best Price From China
  • What is DC AC Withstand High Voltage Test Machine Power Frequency Dielectric Test Set
  • What is Transformer Test Bench for Temperature Rise and Routine Compliance Testing

What is High Voltage Transformer Comprehensive Test Bench Integrated Transformer Test System

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

1 Set US$5,000.00-70,000.00 / Set

Sepcifications

  • After-sales Service Onsite and Video Call Remote Guidance
  • Warranty 2 Years Free Warranty Long Life Service
  • Max Diameter of Workpiece 2000mm
  • Mass Scope of Workpiece 1000kg
  • Type Universal Testing Machine
  • Maxcapacity <1000KN
  • Accuracy Grade 0.5
  • Load Way Electronic Load
  • Loading Method Dynamic Load
  • Display LCD Display
  • Control Computer Control
  • Weight 500-1000Kg
  • Power Source AC380V
  • Oil Cylinder Position Under
  • Transport Package Plywood Case
  • Specification 1000mm*600mm*560mm
  • Trademark Sansion
  • Origin China
  • Test Project1 Oil Chemical Test (Including Acid Value, Flash Poi
  • Test Project2 Transformer Insulation Resistance Test
  • Test Project3 Transformer Winding Resistance Test
  • Test Project4 Transformer Voltage Ratio Measurement and Connecti
  • Test Project5 Transformer No-Load Current Percentage and No-Load
  • Test Project6 Transformer Short-Circuit Impedance and Load Loss
  • Test Project7 Transformer Dielectric Loss Test
  • Test Project8 Power Frequency Withstand Voltage Test of Transfor
  • Test Project9 Transformer Induction Withstand Voltage Test (Incl
  • Test Project10 Lightning Impulse Test (Including Full Wave and Cu
  • Type Test Temperature Rise Test
  • Special Experiment1 Zero Sequence Impedance Test
  • Special Experiment2 No Load Current Harmonic Test

Product Description

Product Description High Voltage Transformer Comprehensive Test Bench Integrated Transformer Test System General Information: SXBZ-III series Transformer Comprehensive Test Bench is applied for ex-work and maintenance detecting on varioustransformers. lt's widely used in the fields of power supply ...

Learn More

Integrated Transformer Test System Comparison
Transaction Info
Price US$5,000.00-70,000.00 / Set US$2,000.00-8,000.00 / Set US$2,000.00-8,000.00 / Set US$2,000.00-8,000.00 / Set US$2,000.00-8,000.00 / Set
Min Order 1 Set 1 Set 1 Set 1 Set 1 Set
Payment Terms LC, T/T, PayPal, Western Union LC, T/T, D/P, PayPal, Western Union, Small-amount payment LC, T/T, D/P, PayPal, Western Union, Small-amount payment LC, T/T, D/P, PayPal, Western Union, Small-amount payment LC, T/T, D/P, PayPal, Western Union, Small-amount payment
Quality Control
Management System Certification ISO9001:2015, ISO45001:2018, ISO14001 ISO45001:2018, ISO14001 ISO45001:2018, ISO14001 ISO45001:2018, ISO14001 ISO45001:2018, ISO14001
Trade Capacity
Export Markets North America, South America, Southeast Asia/ Mideast, Africa, Domestic North America, South America, Europe, Southeast Asia/ Mideast North America, South America, Europe, Southeast Asia/ Mideast North America, South America, Europe, Southeast Asia/ Mideast North America, South America, Europe, Southeast Asia/ Mideast
Annual Export Revenue - 12,540,865 RMB 12,540,865 RMB 12,540,865 RMB 12,540,865 RMB
Business Model Own Brand, ODM, OEM Own Brand, ODM, OEM Own Brand, ODM, OEM Own Brand, ODM, OEM Own Brand, ODM, OEM
Average Lead Time Peak Season Lead Time: one month
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: within 15 workdays
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: within 15 workdays
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: within 15 workdays
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: within 15 workdays
Off Season Lead Time: within 15 workdays
Product Attributes
Specification
After-sales Service: Onsite and Video Call Remote Guidance;
Warranty: 2 Years Free Warranty Long Life Service;
Max Diameter of Workpiece: 2000mm;
Mass Scope of Workpiece: 1000kg;
Type: Universal Testing Machine;
Maxcapacity: <1000KN;
Accuracy Grade: 0.5;
Load Way: Electronic Load;
Loading Method: Dynamic Load;
Display: LCD Display;
Control: Computer Control;
Weight: 500-1000Kg;
Power Source: AC380V;
Oil Cylinder Position: Under;
Test Project1: Oil Chemical Test (Including Acid Value, Flash Poi;
Test Project2: Transformer Insulation Resistance Test;
Test Project3: Transformer Winding Resistance Test;
Test Project4: Transformer Voltage Ratio Measurement and Connecti;
Test Project5: Transformer No-Load Current Percentage and No-Load;
Test Project6: Transformer Short-Circuit Impedance and Load Loss;
Test Project7: Transformer Dielectric Loss Test;
Test Project8: Power Frequency Withstand Voltage Test of Transfor;
Test Project9: Transformer Induction Withstand Voltage Test (Incl;
Test Project10: Lightning Impulse Test (Including Full Wave and Cu;
Type Test: Temperature Rise Test;
Special Experiment1: Zero Sequence Impedance Test;
Special Experiment2: No Load Current Harmonic Test;
Type: Strength Testing Machine;
Accuracy Grade: 0.5;
Load Way: Electronic Load;
Loading Method: Electrical;
Display: LCD;
Control: Computer Control;
Power Source: AC220V;
Testing Method: Low Pressure Pulse Method, Impulse Lightning Flow;
Frequency: 6.25MHz, 12.5MHz, 25MHz, 50MHz, 100MHz;
Output Voltage: 0~-35kv;
Discharge Engergy: ≤1225j(2450j);
Usage: Network Cable Tester;
Component: Host, Power Supply, Tracing and Locator;
Measurement Distance: Less Than 60km &#160;&#160;;
Operating Model&#160;: Touch Pen and Mouse Operation;
Type: Strength Testing Machine;
Accuracy Grade: 0.5;
Load Way: Electronic Load;
Loading Method: Electrical;
Display: LCD;
Control: Computer Control;
Power Source: AC220V;
Testing Method: Low Pressure Pulse Method, Impulse Lightning Flow;
Frequency: 6.25MHz, 12.5MHz, 25MHz, 50MHz, 100MHz;
Output Voltage: 0~-35kv;
Discharge Engergy: ≤1225j(2450j);
Usage: Network Cable Tester;
Component: Host, Power Supply, Tracing and Locator;
Measurement Distance: Less Than 60km &#160;&#160;;
Operating Model&#160;: Touch Pen and Mouse Operation;
Type: Strength Testing Machine;
Accuracy Grade: 0.5;
Load Way: Electronic Load;
Loading Method: Electrical;
Display: LCD;
Control: Computer Control;
Power Source: AC220V;
Testing Method: Low Pressure Pulse Method, Impulse Lightning Flow;
Frequency: 6.25MHz, 12.5MHz, 25MHz, 50MHz, 100MHz;
Output Voltage: 0~-35kv;
Discharge Engergy: ≤1225j(2450j);
Usage: Network Cable Tester;
Component: Host, Power Supply, Tracing and Locator;
Measurement Distance: Less Than 60km &#160;&#160;;
Operating Model&#160;: Touch Pen and Mouse Operation;
Type: Strength Testing Machine;
Accuracy Grade: 0.5;
Load Way: Electronic Load;
Loading Method: Electrical;
Display: LCD;
Control: Computer Control;
Power Source: AC220V;
Testing Method: Low Pressure Pulse Method, Impulse Lightning Flow;
Frequency: 6.25MHz, 12.5MHz, 25MHz, 50MHz, 100MHz;
Output Voltage: 0~-35kv;
Discharge Engergy: ≤1225j(2450j);
Usage: Network Cable Tester;
Component: Host, Power Supply, Tracing and Locator;
Measurement Distance: Less Than 60km &#160;&#160;;
Operating Model&#160;: Touch Pen and Mouse Operation;
Supplier Name

Sansion Power Electric Co., Ltd.

Diamond Member Audited Supplier

Wuhan Goldhome Hipot Electrical Co., Ltd.

Diamond Member Audited Supplier

Wuhan Goldhome Hipot Electrical Co., Ltd.

Diamond Member Audited Supplier

Wuhan Goldhome Hipot Electrical Co., Ltd.

Diamond Member Audited Supplier

Wuhan Goldhome Hipot Electrical Co., Ltd.

Diamond Member Audited Supplier