Purchase Qty. Reference FOB Price
1-4 Sets US$128,500.00
5+ Sets US$122,000.00
Product Description
Light gauge steel framing systems consist of structural frames fabricated using cold formed steel sections. They can be used throughout a structure, including load-bearing exterior walls, non-load bearing interior walls, floor joists, curtain walls and roof trusses.The system automatically generates ...
| Transaction Info | |||||
|---|---|---|---|---|---|
| Price | US$122,000.00-128,500.00 / Set | US$12,000.00-20,000.00 / Piece | US$23,500.00-33,900.00 / Piece | US$24,000.00-32,000.00 / Set | US$23,000.00-28,000.00 / Piece |
| Min Order | 1 Set | 1 Piece | 1 Piece | 1 Set | 1 Piece |
| Payment Terms | T/T, LC | T/T, LC | T/T, LC | T/T, LC | T/T, LC | Quality Control |
| Product Certification | CE, GS, ISO9001 | SGS | SGS | SGS | SGS |
| Management System Certification | - | - | - | - | - | Trade Capacity |
| Export Markets | North America, Europe, Southeast Asia/ Mideast | North America, Europe, Southeast Asia/ Mideast | North America, Europe, Southeast Asia/ Mideast | North America, Europe, Southeast Asia/ Mideast | North America, Europe, Southeast Asia/ Mideast |
| Annual Export Revenue | - | - | - | - | - |
| Business Model | ODM, OEM | ODM, OEM | ODM, OEM | ODM, OEM | ODM, OEM |
| Average Lead Time | Peak Season Lead Time: 1-3 monthsOff Season Lead Time: 1-3 months | Peak Season Lead Time: 1-3 monthsOff Season Lead Time: 1-3 months | Peak Season Lead Time: 1-3 monthsOff Season Lead Time: 1-3 months | Peak Season Lead Time: 1-3 monthsOff Season Lead Time: 1-3 months | Peak Season Lead Time: 1-3 monthsOff Season Lead Time: 1-3 months | Product Attributes |
| Specification | |||||
| Supplier Name |
Xiamen Xinhonghua Machinery Co., Ltd.
|
Xiamen Xinhonghua Machinery Co., Ltd.
|
Xiamen Xinhonghua Machinery Co., Ltd.
|
Xiamen Xinhonghua Machinery Co., Ltd.
|
Xiamen Xinhonghua Machinery Co., Ltd.
|