| Specification |
Type: Network Cabinet;
Usage: Video Surveillance Systems, Network Integration System, Remote Monitoring System, Closed-Circuit Monitoring System, Electronic Monitoring System, Wireless Monitoring System;
Installation: Vertical;
Fan Number: Optional;
Capacity: Optional;
Condition: New;
Application: Data Center Server Rack;
Front Door: Metal Mesh Door/ Glass Door;
|
Type: Server Cabinet;
Usage: Network Integration System;
Installation: Vertical;
Fan Number: Two/Four;
Capacity: 18u/22u/27u/32u/37u/42u/47u;
Condition: New;
Material: SPCC Cold Rolled Steel;
Style: Floor Standing;
Colour: Optional;
Product Function: Install Network Equipment, Switches, Routers, Kvm;
Size: 600*2000*800;
Surface Finish: Degreasing,Pickling,Phosphating,Powder Coated;
|
Type: Server Cabinet;
Usage: Network Integration System;
Installation: Vertical;
Fan Number: Two/Four;
Capacity: 18u/22u/27u/32u/37u/42u/47u;
Condition: New;
Material: SPCC Cold Rolled Steel;
Style: Floor Standing;
Colour: Optional;
Product Function: Install Network Equipment, Switches, Routers, Kvm;
Size: 600*2000*800;
Surface Finish: Degreasing,Pickling,Phosphating,Powder Coated;
|
Type: Server Cabinet;
Usage: Network Integration System;
Installation: Vertical;
Fan Number: Two/Four;
Capacity: 18u/22u/27u/32u/37u/42u/47u;
Condition: New;
Material: SPCC Cold Rolled Steel;
Style: Floor Standing;
Colour: Optional;
Product Function: Install Network Equipment, Switches, Routers, Kvm;
Size: 600*2000*800;
Surface Finish: Degreasing,Pickling,Phosphating,Powder Coated;
|
Type: Server Cabinet;
Usage: Video Surveillance Systems, Network Integration System, Remote Monitoring System, Closed-Circuit Monitoring System, Electronic Monitoring System, Wireless Monitoring System;
Installation: Vertical;
Fan Number: OEM;
Capacity: 30U-40U;
Condition: New;
Standard: GB, En;
Tolerance: ±0.05mm;
Surface Treatment: Powder Coating, Plating, Oxide, Anodizing;
Machining Method: Laser Cutting, Bending, Welding, Stamping;
Material: Aluminum, Stainless Steel, Copper, Brass;
Port of Shipment: Ningbo/Shanghai;
Metal Fabrication Delivery Time: 1-2 Weeks/2-4 Weeks/4+ Weeks(Pre-Planned);
Metal Fabrication Package Design: Accepted;
Metal Fabrication Storage: 1000 Sq. M.;
Metal Fabrication Service: Metal Fabrication;
Parts: Parts;
OEM Parts: OEM Parts;
Enclosure: Enclosure;
Cabinet: Cabinet;
Box: Box;
|