Min. Order Reference FOB Price
1 Piece US$3,800.00-5,000.00 / Piece
Product Description
Product Description Apply to over 7 threads silver plated wire,tin plate wire,enamellaed wire ,naked copper wire,CCS,CCA ect super fine conductor and cored wire twisting Twisting CY 300 CY 500 CY 650 CY 800 Twisting section(mm²) 0.0137-0.45 0.05-2.5 0.08-6.0 0.25-10.0 Diameter of ...
| Transaction Info | |||||
|---|---|---|---|---|---|
| Price | US$3,800.00-5,000.00 / Piece | US$2,222.00 / Set | US$8,666.00 / Set | US$86,000.00 / Set | US$22,500.00 / Set |
| Min Order | 1 Piece | 1 Set | 1 Set | 1 Set | 1 Set |
| Payment Terms | T/T, LC, D/P, PayPal, Western Union, Small-amount payment | T/T, PayPal | T/T, PayPal | T/T, PayPal | T/T, PayPal | Quality Control |
| Product Certification | RoHS, ISO, CE, SGS | RoHS, ISO, CE | RoHS, ISO, CE | RoHS, ISO, CE | RoHS, ISO, CE |
| Management System Certification | - | - | - | - | - | Trade Capacity |
| Export Markets | Southeast Asia/ Mideast | Southeast Asia/ Mideast, Domestic | Southeast Asia/ Mideast, Domestic | Southeast Asia/ Mideast, Domestic | Southeast Asia/ Mideast, Domestic |
| Annual Export Revenue | - | - | - | - | - |
| Business Model | ODM, OEM | Own Brand, ODM, OEM | Own Brand, ODM, OEM | Own Brand, ODM, OEM | Own Brand, ODM, OEM |
| Average Lead Time | Peak Season Lead Time: 1-3 monthsOff Season Lead Time: 1-3 months | Peak Season Lead Time: 1-3 monthsOff Season Lead Time: one month | Peak Season Lead Time: 1-3 monthsOff Season Lead Time: one month | Peak Season Lead Time: 1-3 monthsOff Season Lead Time: one month | Peak Season Lead Time: 1-3 monthsOff Season Lead Time: one month | Product Attributes |
| Specification | |||||
| Supplier Name |
FOSHAN ER CHUANG ZHI DA IMPORT & EXPORT TRADING CO., LTD.
|
Dongguan Newtopp Electrical Machinery Co., Ltd.
|
Dongguan Newtopp Electrical Machinery Co., Ltd.
|
Dongguan Newtopp Electrical Machinery Co., Ltd.
|
Dongguan Newtopp Electrical Machinery Co., Ltd.
|
|
|