Mr. Zhangfuwang
Address:
4751, Area a, 5th Floor, Block a, Research Building, Middle End Building, Intersection of Hongfeng Road and Science Avenue, Hefei, Anhui, China
Telephone:
Zip Code:
Fax:
| Please sign in to view contact details |
Account Registered in:
2023
Business Range:
Tools & Hardware
Business Type:
Manufacturer/Factory
Main Products:
Electric Hammer
Company Introduction
Production Capacity
GBH2-18E Hammer Product Features
1. Equipped with soft grip handles on the main handle and gear housing
2. Impact stop, suitable for drilling on wood and steel
3. Overload clutch
4. Small in size, compact in design, and weighing as little as 2 kilograms, it is an ideal tool for head up operations
5. Continuously variable speed control
6. Forward/backward operation
GBH2-18E ...
1. Equipped with soft grip handles on the main handle and gear housing
2. Impact stop, suitable for drilling on wood and steel
3. Overload clutch
4. Small in size, compact in design, and weighing as little as 2 kilograms, it is an ideal tool for head up operations
5. Continuously variable speed control
6. Forward/backward operation
GBH2-18E ...
GBH2-18E Hammer Product Features
1. Equipped with soft grip handles on the main handle and gear housing
2. Impact stop, suitable for drilling on wood and steel
3. Overload clutch
4. Small in size, compact in design, and weighing as little as 2 kilograms, it is an ideal tool for head up operations
5. Continuously variable speed control
6. Forward/backward operation
GBH2-18E Hammer Operation Method
1. Install the drill bit into the chuck, rotate it left and right to find the matching position of the pit and groove, and press the drill bit into the chuck
2. Press the chuck back and directly pull out the drill bit
ZMFF004
1. Equipped with soft grip handles on the main handle and gear housing
2. Impact stop, suitable for drilling on wood and steel
3. Overload clutch
4. Small in size, compact in design, and weighing as little as 2 kilograms, it is an ideal tool for head up operations
5. Continuously variable speed control
6. Forward/backward operation
GBH2-18E Hammer Operation Method
1. Install the drill bit into the chuck, rotate it left and right to find the matching position of the pit and groove, and press the drill bit into the chuck
2. Press the chuck back and directly pull out the drill bit
ZMFF004
Factory Address:
4751, Area a, 5th Floor, Block a, Research Building, Middle End Building, Intersection of Hongfeng Road and Science Avenue, Hefei, Anhui, China